Sarphatistraat Offices
Steven Holl Architects
Amsterdam, The Netherlands

Photo: arcspace
The new addition to the renovated Singel Gracht building,
the former Federal Warehouse of Medical Supplies, has replaced one
of the outbuildings on the canal side of the four - story brick "U"
building.
A new boardwalk with public benches and a row of special cypress
trees along the canal marks the new public space.

Photo: arcspace
The new large conference room pavilion, available to the public
for weddings, meetings, and other events, has been built directly
on the foundation wall of the new mechanical parking system
(capacity 48 cars).

Photo: arcspace
Sponge-like spaces in a plan and section were developed with
passages, storage, etc., located between the perforated walls. The
building scale of the pavilion is thus related to detail scales in
the renovation.

Photo: arcspace
The concept of "Patterns in a Chromatic Field", inscribed in a
rectangular "sponge", establishes a series of perspectival
overlapping interior spaces animated by "phenomenal screens of
color." The screens form a spatial and experiential frame
containing services such as lighting, supply and return air
grilles.
The perforated screens developed in three dimensions are analogous
to the "Menger Sponge" principle of openings continuously cut in
planes approaching zero volume.

Photo: arcspace
Facts about Sarphatistraat Offices
Net Floor Area:
Addition: 3,500 ft2
Renovation: 50,000 ft2
Design Architect:
Steven Holl, Justin Korhammer
Project Architect:
Justin Korhammer
Project Team:
Hideaki Ariizumi
Martin Cox
Annette Goderbauer
Yoh Hanaoka
Heleen van Heel
Associate architect:
Rappange & Partners Architecten
Project Manager:
Bart Kwant
Project Architect;
Bert Wever
Structural engineers:
Ingenieursgroep† Van Rossum
Contractor:
VOF Van Eesteren
Client:
Woningbouwvereniging Het Oosten